Mtibwa Agricultural Expansion

CLIENT: Mtibwa Sugar Estate Limited
LOCATION: Mtibwa Sugar Estate, Morogoro, Tanzania
TYPE OF CONTRACT: FIDIC Design

Scope of Services Provided:

  • Infrastructure planning with regards to haulage roads, drainage and irrigation layout.
  • Detailed engineering design for pump stations, pipelines, overhead transmission lines and balancing dams.
  • Irrigation design and bulk distribution network.


Project Description:

  • Optimising Bulk and infield water requirements taking into account harvesting strategy and seasonal river flows.
  • Overall design of 4 500ha of irrigation under pivot.
  • Design of river and infield pump stations.
  • Associated bulk rising mains.
  • Design of primary drainage system.
  • Design of two larger off-channel storage facilities.
  • Design all the electrical infrastructure – including new 132kVA overhead line.


Features:
Overall features of this project:
  • Greenfields project with no existing infrastructure.
  • Two (2) river pump stations with total capacity of 7 m3/s (25 200m3/hr).
  • Two (2) infield pump stations with total capacity of 19 000 m3/hr.
  • Two (2) off-channel storage dams with total storage capacity of 65M m3
  • Drainage master plan for the entire area.
  • Detailed design of the primary drains and outfalls.
  • Staff and management village services – including offices and workshop complex.
  • New 132kV line which is 70km long.
  • 16km HDPe pipeline up to 400 dia.
  • 26 km GRP pipeline up to 1600 dia.


The project was planned in 2 phases:
  • Phase 1 1770ha under centre pivot irrigation with a total of 25 pivots.
  • Phase 2 3100ha under centre pivot irrigation with a total of 52 pivots.


The irrigation system was designed to supply the following:
  • Peak monthly nett irrigation requirement:149mm.
  • Daily gross irrigation requirement for centre pivot @ 85% efficiency = 5.6mm per day.